PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed rebar inside the couplers around the 4th floor Facing North-West (800x600).jpg Metal decking at Derrick 4 (Roof) Facing South (800x600).jpg Started installing metal decking at only half of Derricks 4 - 5 Facing West (800x600).jpg Stripped the slab on deck forms at the 3rd floor Facing South-West (800x600).jpg Installing duct hangers at the 1st Floor Facing West (800x600).jpg Metal tracks at the 2nd Floor Facing North  (800x600).jpg Started the layout for the interior framing at the 2nd Floor Facing North (800x600).jpg Installed piping for the water tie in at Rahway Ave. (800x600).jpg
Previous pageNext page Installing duct hangers at the 1st Floor Facing West (800x600)
Installing duct hangers at the 1st Floor Facing West (800x600)